Your boiler is simply starting up and checking its internal systems, which is a normal part of its power-on sequence.
This is a minor fault. Keep an eye on it and mention it at your next annual boiler service. Reset the boiler and see if it clears.
Technical description: Please wait, initialisation in progress.
What causes this fault?
This sequence occurs when the boiler is first switched on or regained power after a cut, signalling that the internal control board is testing its electronic components. It is a standard self-diagnostic phase where the system verifies everything is safe before allowing the burner to light. No physical part has failed; the boiler is simply conducting a required safety handshake.
DIY fix possible
Wait for approximately 30 to 60 seconds for the sequence to finish.If the code persists for more than 5 minutes, turn the power off and back on at the fused spur.Ensure the boiler condensate pipe is not frozen if this occurs during extreme cold weather.
Find a Gas Safe engineer
Search the official register for a qualified engineer in your area.
Gas Safe Register →Protect yourself from future repair bills
A boiler cover plan would cover faults like P1, P2, P3, P1... — no call-out fees, no surprises.
Affiliate links — we may earn a commission at no extra cost to you.
Worcester Bosch Greenstar 25i (ZWB 7-25) is discontinued — time for a new one?
Parts for discontinued models can be hard to find and expensive. A new A-rated boiler could save you money on both repairs and energy bills.
Affiliate links — we may earn a commission at no extra cost to you.