Technical description
System deaeration in progress. During this phase, which lasts 18 hours, the boiler pump is started at pre-established intervals, thus allowing deaeration of the central heating system.
Engineer required
This fault requires a Gas Safe registered engineer. Do not attempt gas-related repairs yourself.
Find a Gas Safe engineer
Search the official register →