Technical description
System deaeration in progress. During this phase, which lasts 18 hours, the boiler pump is started at pre-established intervals, thus allowing deaeration of the central heating system.
DIY fix possible
Wait for the 18-hour cycle to complete automaticallyMonitor your radiator valves for any air locksIf you must use the boiler immediately, try turning the power off and back on to reset the timer
Find a Gas Safe engineer
Search the official register →