Technical description
Automatic venting program / de-aeration programm in progress (takes 17 minutes)
DIY fix possible
Wait 17 minutes for the cycle to complete automaticallyEnsure all radiator valves are open to help move air through the systemOnce finished, the boiler should return to normal operation without intervention
Find a Gas Safe engineer
Search the official register →