What the manual says
Manufacturer manualPressure 0.5–0.8 bar — filling needed
From this model's manual
Verified against the Atag/Atag Is System installation & service manual, page 72.
DIY fix possible
Locate the filling loop (usually a silver flexible hose) underneath or near the boiler.Open the small valve handle(s) slowly until you hear water moving into the system.Watch the pressure gauge on the boiler display and close the valves once it reaches 1.5 bar.
Find a Gas Safe engineer
Search the official register →
Boiler cover options
Avoid the next call-out bill
A cover plan would handle faults like 1P4: no call-out fees, no surprise bills.
Approved partner
Get a quote →
Domestic Appliance Guard
Unlimited call-outs, 24/7 helpline, no price-hike promise
Affiliate links. We may earn a commission at no extra cost to you.
Related fault codes
All 24 fault codes on the iS System
Seeing a different code? Every code this model can display, in one place.