Baxi 109 Fault Code
The Baxi 109 fault code means: your boiler is struggling to move water around the system properly before it starts the main heating process, usually due to a blockage or a pump issue.. It appears on 10 Baxi models in our database.
Technical description: Pre-circulation fault
Engineer required
This fault requires a Gas Safe registered engineer. Do not attempt gas-related repairs yourself.
Find a Gas Safe engineer
Search the official register for a qualified engineer in your area.
Gas Safe Register →Avoid the next call-out bill
A cover plan would handle faults like 109: no call-out fees, no surprise bills.
Affiliate links. We may earn a commission at no extra cost to you.
Baxi models that show the 109 fault code
Click a model for the full fault code list and model-specific repair notes.
- 124 Combi Repair: £150-£350
- 200 / 400 Combi Repair: £150-300
- 600 Combi (range) Repair: £150-£350
- 624 Combi Repair: £150-£350
- EcoBlue Repair: £150-300
- Ecoblue Advance Combi Repair: £150-300
- EcoBlue Advance Heat Repair: £150-£350
- EcoBlue Heat Repair: £150-300
- EcoBlue Plus Combi Repair: £150-£350
- EcoBlue System Repair: £150-350
Source
Baxi 109 fault code information on this page is sourced and cross-checked against the official Baxi service / installation manuals for each affected model.
Reviewed by the BoilerFaultCodes Editorial Team · Last reviewed 7 July 2026