High
b9 on Remeha Avanta Plus 28c

Your boiler has shut down because water isn't moving through the system quickly enough, causing it to overheat too fast.

Call an engineer soon

Book a Gas Safe engineer within 24 to 48 hours. Your boiler may be unsafe or could break down completely if left.

Technical description

Lock-out: appears if the maximum temperature rise is exceeded or if the dT between the supply and return temperature ≥ 45°C or a rate of rise in the flow temperature > 1°C/sec. And also at a boiler-start with no through flow or insufficient water. The boiler will try to restart after 10 minutes.

Engineer required

This is a high severity fault. Stop using the boiler and call a Gas Safe registered engineer. Do not attempt gas-related repairs yourself.

Find a Gas Safe engineer
Search the official register →

Related fault codes

Related guides you might find useful