Technical description
Automatic filling active
DIY fix possible
Wait for a few minutes while the boiler completes the automatic repressurisation cycle.Observe the pressure gauge on the front of the boiler to ensure it settles within the green zone (typically 1.0 to 1.5 bar).Once the cycle is complete, the S.99 code should disappear and the boiler will return to its normal standby or heating mode.
Find a Gas Safe engineer
Search the official register →