Medium
Block 11 on Atag Premier

Your boiler has temporarily stopped providing heating because it detected that the water is moving too slowly or building up too much heat inside the system.

Book a service

This fault should be looked at by a Gas Safe engineer within the next week or two. It may get worse if left.

Technical description

Maximum (cid:1)T of flow and return sensor in central heating has repeatedly been exceeded. During the block normal operation of the hot water supply is possible. The pump continues to operate at minimum capacity during the block.

Engineer required

This fault requires a Gas Safe registered engineer. Do not attempt gas-related repairs yourself.

Find a Gas Safe engineer
Search the official register →

Related fault codes

Related guides you might find useful