Technical description
De-aeration program will start (if the pressure was below 0.7 bar). This will last for approx 7 mins.
DIY fix possible
Wait 7 minutes for the automatic de-aeration program to complete.Check the pressure gauge on the front of the boiler once the program has finished.If the pressure is below 1.0 bar, use the filling loop underneath the boiler to Top up the system to between 1.0 and 1.5 bar.
Find a Gas Safe engineer
Search the official register →