Technical description
De-aeration program actif
DIY fix possible
Wait for the cycle to complete, which typically takes between 10 to 20 minutes.Ensure your heating and hot water are still turned off at your thermostat while the process finishes.If the boiler does not resume normal operation after 30 minutes, switch the power off and back on at the fused spur.
Find a Gas Safe engineer
Search the official register →