What the manual says
Manufacturer manualDe-aeration program will start (if the pressure was below 0.7 bar). This will last for approx 7 mins.
From this model's manual
Verified against the Atag A200sov installation & service manual.
DIY fix possible
Wait approximately 7 to 10 minutes for the automatic countdown to completeEnsure the blue filling loop taps are fully closedCheck that the water pressure gauge is between 1.0 and 1.5 bar
Find a Gas Safe engineer
Search the official register →
Boiler cover options
Avoid the next call-out bill
A cover plan would handle faults like 105: no call-out fees, no surprise bills.
Approved partner
Get a quote →
Domestic Appliance Guard
Unlimited call-outs, 24/7 helpline, no price-hike promise
Affiliate links. We may earn a commission at no extra cost to you.