High
105H on Ideal Isar HE

Your boiler is failing to start because the electrical supply wires are connected in the wrong order.

Call an engineer soon

Book a Gas Safe engineer within 24 to 48 hours. Your boiler may be unsafe or could break down completely if left.

Technical description

PHASE REVERSAL

Engineer required

This is a high severity fault. Stop using the boiler and call a Gas Safe registered engineer. Do not attempt gas-related repairs yourself.

Find a Gas Safe engineer
Search the official register →

Related guides you might find useful