What the manual says
Manufacturer manualDe-aeration program will start. This will last for approx 7 mins. (triggered if pressure was below 0.7 bar)
From this model's manual
Verified against the Atag Ic28 installation & service manual, page 48.
DIY fix possible
Wait 7 minutes for the boiler to complete its automatic air-removal cycleCheck the pressure gauge is between 1.0 and 1.5 barIf the code returns, top up the water pressure using the filling loop
Find a Gas Safe engineer
Search the official register →
Boiler cover options
Avoid the next call-out bill
Monthly cover means no unexpected bills when your boiler breaks down.
Approved partner
Get a quote →
Domestic Appliance Guard
Unlimited call-outs, 24/7 helpline, no price-hike promise
Affiliate links. We may earn a commission at no extra cost to you.