Technical description
Turn power off and on
DIY fix possible
Switch the electricity supply to the boiler off at the wall or fuse spur.Wait approximately 30 seconds for the system to fully power down.Switch the electricity back on and wait for the boiler to complete its start-up sequence.
Find a Gas Safe engineer
Search the official register →