What the manual says
Manufacturer manualDHW min working pressure
From this model's manual
Verified against the Keston R Sm 20 Fb installation & service manual, page 3.
DIY fix possible
Locate the filling loop (a flexible metal or plastic pipe) underneath the boiler.Slowly open the valves on the filling loop to allow cold mains water into the system.Watch the pressure gauge on the front of the boiler until it reaches the green zone, typically between 1.0 and 1.5 bar.Close both valves tightly and ensure the filling loop is fully shut off.
Find a Gas Safe engineer
Search the official register →
Boiler cover options
Avoid the next call-out bill
A cover plan would handle faults like 0.6 bar: no call-out fees, no surprise bills.
Approved partner
Get a quote →
Domestic Appliance Guard
Unlimited call-outs, 24/7 helpline, no price-hike promise
Affiliate links. We may earn a commission at no extra cost to you.