What the manual says
Manufacturer manualWhilst filling is in progress (weather-compensated control unit)
DIY fix possible
Locate the filling loop (a flexible silver hose) underneath your boiler or near your pipework.Gradually open the valves on the filling loop to allow water into the system.Monitor the pressure gauge on the front of the boiler until it reaches the green zone (typically between 1.0 and 1.5 bar).Close both valves firmly once the pressure is correct.
Avoid the next call-out bill
Monthly cover means no unexpected bills when your boiler breaks down.
Affiliate links. We may earn a commission at no extra cost to you.
All 39 fault codes on the Vitodens 200-W System
Seeing a different code? Every code this model can display, in one place.