Low Information
P1, P2, P3, P1... on Worcester Bosch ZWB 7-25

Your boiler is currently going through its internal start-up process and is not experiencing a fault.

Monitor it

This is a minor fault. Keep an eye on it and mention it at your next annual boiler service. Reset the boiler and see if it clears.

Technical description

Please wait, initialisation in progress.

What causes this fault?

This sequence occurs when the boiler is first switched on or regained power after a cut, signalling that the internal control board is testing its electronic components. It is a standard self-diagnostic phase where the system verifies everything is safe before allowing the burner to light. No physical part has failed; the boiler is simply conducting a required safety handshake.

DIY fix possible

Wait for approximately 30 to 60 seconds for the sequence to finish.If the code persists for more than 5 minutes, turn the power off and back on at the fused spur.Ensure the boiler condensate pipe is not frozen if this occurs during extreme cold weather.

Find a Gas Safe engineer
Search the official register →

Related guides you might find useful