High
S.54 on Heatline Monza

Your boiler has paused because either the water pressure in your system is too low or the water is not circulating properly between your radiators and the boiler.

Call an engineer soon

Book a Gas Safe engineer within 24 to 48 hours. Your boiler may be unsafe or could break down completely if left.

Technical description

Waiting cycle: lack of water in the installation/temperature rise between heating fl ow and return is too high

Engineer required

This is a high severity fault. Stop using the boiler and call a Gas Safe registered engineer. Do not attempt gas-related repairs yourself.

Find a Gas Safe engineer
Search the official register →

Related guides you might find useful