Technical description
Whilst filling is in progress (weather-compensated control unit)
DIY fix possible
Locate the filling loop (a flexible silver hose) underneath your boiler or near your pipework.Gradually open the valves on the filling loop to allow water into the system.Monitor the pressure gauge on the front of the boiler until it reaches the green zone (typically between 1.0 and 1.5 bar).Close both valves firmly once the pressure is correct.
Find a Gas Safe engineer
Search the official register →