High
FE94 on Alpha Pro Tec Plus

Your boiler's main control panel is failing to process information correctly, which has caused it to shut down for safety.

Call an engineer soon

Book a Gas Safe engineer within 24 to 48 hours. Your boiler may be unsafe or could break down completely if left.

What the manual says

Manufacturer manual

Display PCB fault.

From this model's manual
Verified against the Alpha Pro Tec 24 installation & service manual, page 35.
Plain-English guidance below. Severity, DIY steps, costs and parts are our interpretation to help you act, not text from the manual.

What causes this fault?

This fault occurs when the boiler's front control panel stops speaking to the internal computer that manages heating and hot water. It is usually caused by a physical failure of the circuit board behind the screen or a loose connection in the wiring that links it to the main system. Because the boiler can no longer receive instructions or display accurate information, it shuts down as a safety precaution.

Engineer required

This is a high severity fault. Stop using the boiler and call a Gas Safe registered engineer. Do not attempt gas-related repairs yourself.

Find a Gas Safe engineer
Search the official register →

Avoid the next call-out bill

A cover plan would handle faults like FE94: no call-out fees, no surprise bills.

Approved partner
Domestic Appliance Guard
Unlimited call-outs, 24/7 helpline, no price-hike promise
Get a quote →

Affiliate links. We may earn a commission at no extra cost to you.

Related guides you might find useful